I've ordered the Navpilot system from my dealer and need some clarification on total system power requirements in anticipation of installation. I'll be using the HRP11 pump which per the manual has a power draw of 4-6A. The FAP7002 packing list shows it uses a 4A fuse and the installation manual is not clear on the total power requirements for the system.
Logically, the pump is in addition to the processor and control unit. I'm assuming that the 4A fuse is only for the processor and control unit. So for the 12V power supply to the FAP7002 I need to provide 8-10A.
Is the 4A processor fuse something that is mounted internally? If the 8-10A total load is correct should I use a 15A fuse and associated wire sizing for the supply?
Logically, the pump is in addition to the processor and control unit. I'm assuming that the 4A fuse is only for the processor and control unit. So for the 12V power supply to the FAP7002 I need to provide 8-10A.
Is the 4A processor fuse something that is mounted internally? If the 8-10A total load is correct should I use a 15A fuse and associated wire sizing for the supply?