Installation basics

Hammerhands

New member
I finally received all my components for a total Electronic re-fit. The Covid really put a hurt on shipping/distribution (3mos.). My concerns are with breaker size/amperage for installation of: TZT12F, DRS4DNXT,Dff3D,and Nav Pilot 300/PG-S. Having just glossing over installation manuals, i haven't come across any hard guidelines on the aforementioned. My distance between my main panel and component mounting's is no more than 6--8 feet, so can anyone chime in on some solid suggestions for wire sizing and amperage to each listed component? Thanks much in advance.
 
I am doing the same with a total refit, the TZT12F has a 4.5 amp fuse inline, so in theory a 5 amp breaker would do fine for that circuit. Personally I will probably be running a 10 amp with 12/2 power wire(probably overkill) just due to materials on hand unless one of the reps comes back on here and says that I am crazy for doing that. I am following this guidance for each component of my system. Hoping to get a couple of hours worth of install work done this weekend, but work might get in the way of that. Trying to take lots of pictures along the way for anyone that is interested in the project.
 
My shipment comes Tuesday. TZT3-12, SCX21, 700 autopilot and 24" NXT dome. Ill be watching and will post pics as well. Thanks guys.
Joey.
 
Rearmount":jpa2d40q said:
My shipment comes Tuesday. TZT3-12, SCX21, 700 autopilot and 24" NXT dome. Ill be watching and will post pics as well. Thanks guys.
Joey.

Curious why you went with the SCX21 over the SCX20?
 
gtstang462002":1nfkyph1 said:
Rearmount":1nfkyph1 said:
My shipment comes Tuesday. TZT3-12, SCX21, 700 autopilot and 24" NXT dome. Ill be watching and will post pics as well. Thanks guys.
Joey.

Curious why you went with the SCX21 over the SCX20?
I just looked. I ordered SCX20.
 
Back
Top